Brindley Builder | Brindley Construction | Pulaski Tennessee

The Brindley Builder

News & Updates from Brindley Construction

Columbia Academy's Newest Additions

Posted by Brindley Construction | Mar 22, 2023 11:24:31 AM

Columbia Academy’s new additions will help continue the tradition of confidence and exceptional education for students. Columbia Academy's Vest Hall - pictured above.

Formerly known as Columbia Military Academy, Columbia Academy (CA) has grown into a staple for Maury County, Tennessee. Since 1979, Columbia Academy has given students the confidence to thrive and serve in their community, and with the newest Vest Hall and Spring Hill Campus additions, CA will be able to continue this tradition for years to come.

Brindley Construction added two separate additions to Columbia Academy's Vest Hall Building.
Vest Hall serves as the Elementary School for the Columbia Campus and the additions were completed inCA Vest Hall December 2022. The first addition was completed during the summer of 2022 and released for the school to start its 2022-2023 school year. This addition consisted of two additional classrooms in a 2-story addition. The second addition was a 2-story addition with a new music room and two additional classrooms (music room - pictured right). It was released to the school in December 2022 to start using on their return from Christmas break.

The challenges on this project were mainly related to tying into the existing structures built in the 1960s. The design team and field crew had to come together to overcome design setbacks and create unique solutions to move forward. The second addition of this project on the second story had an elevation change within the second floor. This was a result of tying into two previous additions to the original building. The addition we added tied into all three structures. A disruption we have come accustomed to is the supply chain issues. This project was originally designed with steel bar joists to support the floors and roof. Due to lead times of bar joists, this was redesigned - by Brindley's request - to wood framing, allowing us to maintain the timeline.

Opened in 2010, Columbia Academy Spring Hill Campus provides preschool through sixth grade. Renovations and additions on this campus included remodeling existing bathrooms and adding approximately 5,000 square feet of new learning space consisting of two new classrooms, an art room, and a music room.CA Spring Hill

This project did not have any ductwork for HVAC systems inside the four classrooms; instead, each classroom has its own stand-alone unit from Bard Systems. The exterior of this building was designed with a cement board panel system that has trim at every joint to give it the look of EFIS. We had a tight deadline for turning over the existing restrooms before students returned on August 1 and having the new addition released prior to the students returning after fall break. Both deadlines were able to be met because we had superb management from our superintendent and office staff along with excellent working relationships with our subcontractors.

Tim Rohling served as Project Manager; Daniel Tomerlin and Sammy Dickey were the Project Superintendents; and Jenny Hobbs was the Project Assistant.

The Brindley Team is honored in helping Columbia Academy continue to grow throughout Maury County.

 

Generic Free Consult CTA Blog - JJ-1

Topics: Projects, Spring Hill, Tennessee, construction

Written by Brindley Construction

Experience, Dedication, and Integrity are our cornerstones. Building the Southeast since 1960, our company has grown and evolved into a successful full-service construction company with extensive experience in commercial, industrial, institutional, religious, assisted-living and medical projects. We are pleased to serve clients in Tennessee, Alabama, Kentucky, Georgia, and Missouri.

Leave a Comment